Technical and production openings

In 2015 as part of the investment carried out for KGHM Polska Miedź S.A. we drilled 4 wells for the central air-conditioning system at the Rudna mine. Using 13 3/8 (339.7 mm) wells, ice water is pumped into the underground air-conditioning system, which enables people to work at greater depths.

 

Go back